Embankment formation

263,170

m3

Filtering gallery

781

ml

Earthwork excavation

1,140

ml

Rock embankment

450,577

m3

Earthwork Drilling

181.300

m3

Relevant information

 

Drilling, excavation, embankment formation , rock embankment & filtering tunnel,  on federal highway 93 kilometer Tijuana- Ensenada, with an incredible work for the strengthening of the tectonic fault in place.

 

Ensenada

Scenic Road

General Resume Video

Copyright 2014 © Constructora Makro. Site by Abraham Sepulveda.

CALL FROM US : 011(52)664.902.0012

FROM MX: 01(664)902.0012

Español