Located in Tijuana, the pumping plant No. 7 currently receives clean water from, has a capacity of 380 mgd pump working with a pumping system 2 + 1, which will be expanded system to a 3 + 1, for a capacity of 570 gpd .

570 lps be pumped into surface buffer tank No. 2 of 1500 m3 concrete about each, which are projected into the water treatment plant. Driving is through a pipe 36 " carbon steel , being the outlet or suction line from the lift station , using suction cups 16".

 

Pumping Plant

No. 7 Tijuana